Our CRAFT.

Five steps, one single contact: from the first measurement to the last track.

01

Fabric

Over 4,000 fabrics in permanent stock, plains, jacquards and prints, with the whole chain mastered from yarn to finishing. Certified inherently flame-retardant, acoustic, antibacterial, blackout, outdoor, recycled. Bespoke printing and colour development. Specifications from every mill, worked to the same standard.

Library of contract fabric collections Colour development and sampling Fire performance testing Digital textile printing on demand The full range of technical performances Samples ready to ship
02

Measuring

We read the drawings, then survey on site, window by window: laser measurements, photographs, everything documented. Constraints, fixing points, pelmets, drops, ceiling heights. In occupied buildings as on live sites, for optimised quantities, an installation schedule that holds and pricing without surprises.

Site drawings and room-by-room referencing Laser measurements, window by window Photographic record and measurement file Checking the fixing substrates Sizing and optimisation of quantities Installation schedule and pricing
03

Making-up

In our dedicated workrooms, in France or in Europe as close to the site as possible. Optimised quantities, cutting plan drawn out, a technical drawing for every product, cutting sheet and production file. Quality control piece by piece, then labelling room by room: sewing craft in the service of how the fabric hangs and how long it lasts.

Calculating quantities and fabric widths before cutting Marking out the cutting plan on the fabric Technical drawings of the finished products Cutting sheets and production file Sewing stations and piece-by-piece control Labelling, packing and installation plan
04

Installation

Our experienced installation teams, or our partners, in France and across Europe. Packing list and installation plan referenced by phase or by floor. Straight or curved tracks, fixings on every substrate, high-level installation, motorisation. Plumb, drops and pleats set by hand, steam finishing to close and on-site alterations where needed: in occupied buildings as on live sites.

Labelled curtain and track packages delivered to site Tracks and fixings installed at ceiling level High-level installation from a mobile tower Track curved to a special shape Motor at the end of the track, and wiring Steam finishing and pleat setting
05

Follow-up

One single contact, from quotation to handover. Sample room, site meetings and written reports. Snagging, sign-off and a complete, traceable as-built file handed over on delivery. Repeat orders and follow-up on everything we have delivered.

The sample room finished in the middle of an unfinished floor Site meeting and written report Pre-handover inspection and snagging sign-off As-built file handed over on delivery Repeat orders and follow-up on delivered collections